Aug 31, 2007

HV crate 8-3 was replaced with the previously broken and now repaired 1458 high power crate. HV module 12 was also replaced.


Sven Lidstrom | 31 Aug 2007 05:14 GMT | AMANDA/Hardware | | permalink

Took TWR out of combined runs for HV work/repairs 02.25 UTC.Combined runs started again at 10.01 UTC with run number 109173


Sven Lidstrom | 31 Aug 2007 05:11 GMT | Ice Cube/Runs | | permalink

Aug 26, 2007

Module 1 (slot 0) on HV crate 8-3 failed during power brown out 2007-08-27 and was restarted.


Sven Lidstrom | 26 Aug 2007 22:13 GMT | AMANDA/Hardware | | permalink

Aug 18, 2007

sps-ichub46 crashed 10.57 UTC Aug 18 and needed a manual reboot.


Sven Lidstrom | 18 Aug 2007 07:33 GMT | Ice Cube/SPS | | permalink

Aug 17, 2007

HV crate 8-3 was replaced again Aug 17 since previous replacement did not function properly.


Sven Lidstrom | 17 Aug 2007 09:23 GMT | AMANDA/Hardware | | permalink

Aug 15, 2007

One of the Acopian DOM power supplies was replaced on ichub49 at 05.45 UTC Aug 15.

See more ...


Sven Lidstrom | 15 Aug 2007 01:01 GMT | Ice Cube/SPS | | permalink

Aug 13, 2007

Stopped run TWR run 300070 after losing HV from crate 8-3


Sven Lidstrom | 13 Aug 2007 04:09 GMT | AMANDA/Runs | | permalink

Started TWR run 300070 after complete power cycle of HV crates and reinitialization of DMADD


Sven Lidstrom | 13 Aug 2007 04:07 GMT | AMANDA/Runs | | permalink

Stopped TWR run 300070 for complete HV power cycle


Sven Lidstrom | 13 Aug 2007 04:05 GMT | AMANDA/Runs | | permalink

Started TWR run 300069 - performing HV work on crate 8-3


Sven Lidstrom | 13 Aug 2007 00:31 GMT | AMANDA/Runs | | permalink

Aug 12, 2007

I3 only run 109069 started at 03.48 UTC


Sven Lidstrom | 12 Aug 2007 22:51 GMT | Ice Cube/Runs | | permalink

Combined run 109068 stopped for AMANDA HV repairs at 03.47


Sven Lidstrom | 12 Aug 2007 22:50 GMT | Ice Cube/Runs | | permalink

Aug 11, 2007

HV crate 8-3 was replaced after a power outage Aug 10


Sven Lidstrom | 11 Aug 2007 03:05 GMT | AMANDA/Hardware | | permalink

HV work and debugging was performed at 07.32 UTC which might have interfered with run 109062


Sven Lidstrom | 11 Aug 2007 03:05 GMT | Ice Cube/Runs | | permalink

Aug 05, 2007

Acopian power supply for tank 72 A and B replaced

See more ...


Sven Lidstrom | 05 Aug 2007 23:25 GMT | Ice Cube/Ice Top | | permalink

Aug 02, 2007

Stopped run 300054 for DMADD initialization tests 01.24 August 3. Started run 300055 at 02.43 August 3.


Sven Lidstrom | 02 Aug 2007 21:50 GMT | AMANDA/Runs | | permalink

Removed TWR 1 in crate 5

See more ...


Sven Lidstrom | 02 Aug 2007 20:59 GMT | AMANDA/Hardware | | permalink

Run 300049 was stopped at 04.00 August 2 and resumed at 17.45 August 2 for DMADD tests.


Sven Lidstrom | 02 Aug 2007 13:02 GMT | AMANDA/Runs | | permalink

Aug 01, 2007

Stopped TWR run 300048 for complete dmadd-initialization after DMADD tests.


Sven Lidstrom | 01 Aug 2007 05:54 GMT | AMANDA/Runs | | permalink