Home
South Pole Logbook

Search below for 'logbook_sop' for help on usage.

Sections

Search

Archives

November 2009
Sun Mon Tue Wed Thu Fri Sat
         

RSS Feed

Powered by Blosxom


Sep 28, 2007

Replaced all UPS batteries in MAPO Sep 28


Sven Lidstrom | 28 Sep 2007 03:38 GMT | AMANDA/Hardware | | permalink

AMANDA shutdown for electrical work in the transformer station


Sven Lidstrom | 28 Sep 2007 01:55 GMT | AMANDA/Hardware | | permalink

Sep 26, 2007

TWR module #3 on TWR NIM crate #3 had to be replaced after power outage


Sven Lidstrom | 26 Sep 2007 07:47 GMT | AMANDA/Hardware | | permalink

TWR DAQ crashed after power outage in the Dark Sector.

See more ...


Sven Lidstrom | 26 Sep 2007 00:53 GMT | AMANDA/Hardware | | permalink

Sep 08, 2007

The HV cable for OM582 was cut and new connector was put on Sep.8


Sven Lidstrom | 08 Sep 2007 02:42 GMT | AMANDA/Hardware | | permalink

Sep 05, 2007

HV crate 8-3 had shutdown and its volatge needed to be reset


Sven Lidstrom | 05 Sep 2007 21:40 GMT | AMANDA/Hardware | | permalink

Sep 03, 2007

pDAQ swicted to i3 only mode while HV repairs were done. Back to i3-AM runs with run number 109271 at 04.28 UTC Sep 4.


Sven Lidstrom | 03 Sep 2007 23:33 GMT | Ice Cube/Runs | | permalink

HV Modules 1 and 10 (slots 0 and 9) on HV crate 8-3 crashed and the crate was reset and restarted on Sep. 4


Sven Lidstrom | 03 Sep 2007 23:30 GMT | AMANDA/Hardware | | permalink

Sep 02, 2007

Cleaned /dev/nst2 and /dev/nst3 on sps-sattx Sep 3


Sven Lidstrom | 02 Sep 2007 23:07 GMT | SPADE | | permalink